 MONITORING REPORT

Technological and Environmental Management Network Ltd

February 25th  2002

 

DREDGING AND RECLAMATION PROGRAMME IN KINGSTON HARBOUR

 

The R1 bund preparation continued during the period covered by this report. First sector completed, material dredged from PB dredge site was still being pumped into the completed section of R1 from the Leonardo Da Vinci.  Significant plume noted from the outlet weir in R1. Screen around outlet appears to be holding.(See Photographs)

 

The Christoforo Colombo dredged in the H1 and H2 areas at the following times:

16/01/2002  07:50 – 21/01/2002  11:35

21/01/2002  20:10 – 22/01/2002  02:05

22/01/2002  23.10 – 25/01/2002  15:30

25/01/2002  23:30 – 31/01/2002  13:55

05/02/2002  17:15 -  10/02/2002  08:30

 

The Christoforo was in the channel again between Wed. 20th and Friday 22nd  February, bur the exact times were not available in time to be included in this report.

 

Monitoring flights were carried out on February 11th and February 19th.

A water quality monitoring exercise  was carried out on February  18th

 

The flight of February 11th suggested that the screen at R3 was not very effective at the time of the flight, however the “plume” noted in the attached  photograph was in fact  material on or near to the  sea floor as the depth in the occluded area was generally less than 0.6 m. There is some drift of the plume toward the SW which will be further monitored. Water quality results for samples collected in this area on February 18th are discussed later in this report. Laboratory analysis results for the set of samples collected in December is now available, and the data is reviewed in this report.

 

WATER QUALITY MONITORING

 

1.         December 13, 2001

This is a follow up of data presented in Monitoring report  #3 dated 3rd January 2002

 

Methodology:         

Monitoring of activities by sea. Water samples collected and field measurements made. Photographs taken.

 

Results:                   

Results of laboratory analysis are represented in Figure 1 and Table 1. TSS data were discussed in Report No. 3. [4]

 

 

 

 

Table 1: Dredging and Reclamation in Kingston Harbour

Water Quality Sampling Sites -December 13, 2001

 

Station ID

LOCATION

GPS N

GPS W

BOD

TURB

TSS

COD

1T

Offshore Discharge Pipe Outfall Hunts Bay

17o58.925

76o50.542

2

3

77.9

405.6

1B

 

 

 

2

3

114.7

351.0

2T

Near Causeway Brdge

17o58.684

76o50.786

2

1

71.8

473.3

2B

 

 

 

2

22

116.5

467.0

3T

Dredge Site

17o58.026

76o50.408

2

48

242.0

677.2

3B

 

 

 

2

0

94.4

720.9

4T

East of Dredge

17o58.026

76o50.158

2

1

435.7

452.4

4B

 

 

 

2

0

111.0

520.9

 

Biological Oxygen Demand (BOD), was <2 at all stations. COD was determined to be in the range 351 – 721 for all samples. The highest values were determined for the sample from the dredge site 3T and 3B, where COD was 677 and 721 respectively. Turbidity was determined to be in the range 0 – 48 NTU for all samples. The highest value for th s parameter (128 NTU) was determined for station 3 in the dredge plume where TSS was determined to be 93.6 mg/l. Other high values were determined for 3T, where turbidity was 48 NTU compared to a TSS of 242 mg/l, and 3B where turbidity was 22 NTU, while TSS was 116 mg/l. At 1T and 1B turbidity was 3 NTU but TSS was 78 and 115 respectively. At 4T (1NTU), and 4B (0 NTU), TSS was 436 and 111 respectively.  

 


2.         January 16, 2002

 

This follows up on Monitoring report #4 dated 24th January 2001 and presents the results of laboratory analysis

 

Table 2: Dredging And Reclamation In Kingston Harbour

Water Quality Sampling Sites -  January 16, 2002

STATION NO

DESCRIPTION

N COORD.

W COORD

1T

Plume in wake of vessel that traversed Channel

17o 58.216'

76o 49.590'

1M

“

“

“

1B

“

“

“

2T

In Wake of Dredge - H1

17o 56.638'

76o 51.299'

2M

“

“

“

2B

“

“

“

3T

Bustamante Beacon

17o 56.759'

76o 50.275'

3B

“

“

“

4

H1 Resampled

17o 56.695'

76o 51.303'

T - Denotes Surface Sample

B- Denotes Sample collected near the bottom

 

Results:

Results of analyses of samples collected on January 16th , as well as field data collected by Jan De Nul on the same occasion are presented in Table 3.

 

Table 3: Lab results and field data  of samples collected January 16, 2002

 

 

 

LAB. RESULTS

FIELD DATA

STATION NO

TIME

DEPTH (M)

TURBIDITY (NTU)

TSS (mg/l)

TSS (mg/l)

1T

1215

 

47

448.20

50

1M

 

 

2

95.50

100

1B

 

13.00

18

147.30

180

2T

1335

 

2

88.70

100

2M

 

 

3

109.00

100

2B

 

9.50

13

163.30

300

3T

1352

 

2

78.50

5

3B

 

4.50

3

232.30

5

4T

1415

 

2

95.30

5

4M

 

 

3

101.50

5

4B